![]() ![]() Prior to the commencement of any works access and installation areas will be inspected to confirm they are in a suitable condition for installation works.In case of multiple rubber pads the pads shall be placed one above the other, with the ribs at right angle to each other.Place the anti-vibration ribbed rubber pads of correct thickness as per approved drawings/submittals.Ensure availability of sufficient slope to the drainpipe, for easy draining of condensate drain.Check the area around the foundation and ensure access to the AHUs/FAHUs from all sides as applicable.Check the Air Handling Unit foundation and ensure it is as per approved drawings.Equipment schedule must be checked for correct location and reference for the Air Handling Unit. ![]() Valves Preparation & AHU Pre Installation Requirements. ![]() Installation of air handling unit, fan coil unit & centrifugal fans for HVAC system. ![]()